GMP project delivery

Define. Deliver. Qualify.

GMP project delivery, from project intake to qualified handover, in one system your project, validation and QA teams share.

Illustrative screen with sample data.
The problem

The GMP side of a capital project still runs on spreadsheets and email.

Every team does its part well. The cost is in the handovers between them, and it lands at the end of the project, when time is most expensive.

How the work is done today, and what each habit costs
How it's done todayWhat it costs
Vendor compliance is checked by hand against the URS, in personal spreadsheets.Gaps surface at FAT, when closing them means a variation order rather than a clarification.
Vendor documents are chased by email, in several versions.Nobody can say which revision was approved, and the turnover package arrives late.
Protocols are copied from the last project.Tests for equipment you don't have, and no tests for the risks you do.
The trace matrix is rebuilt before every audit.Senior validation time spent proving work that was already done.
Status is reported after the fact.Slippage is found at the steering meeting, not while it can still be recovered.
Every week of delay before PPQ.A week of runway or revenue lost.
How it works

Three stages, one record.

GMP Suite follows the project in the order the work happens. Each stage builds on what the one before it approved.

  1. Stage 1

    Define

    Agree what is being built and why.

    • Project intake and approval
    • Scope of work
    • Baseline schedule
    • User requirements (URS)
    • Request for proposal (RFP)
  2. Stage 2

    Deliver

    Choose the right vendor and keep them on plan.

    • Bid comparison against the URS
    • Vendor selection
    • Vendor portal for documents and responses
    • Milestone tracking against the baseline
  3. Stage 3

    Qualify

    Prove it works, and hand it over.

    • Risk assessment
    • IQ, OQ and PQ protocol steps generated from the approved risk assessment
    • Electronic execution
    • Deviations
    • Live trace matrix
    • Qualified handover
The connected thread

Write a requirement once. Follow it all the way to the test that proves it.

On most projects the same requirement is retyped into the RFP, the bid evaluation and the protocol, and each copy drifts. In GMP Suite the RFP imports it from the URS and keeps a link back, and protocol steps trace to the same requirement.

  1. 1 · Written

    In the URS

    URS · BR-201Rev 2

    URS-014

    The vessel shall control temperature at 37.0 °C ± 0.5 °C across the working volume.

    GMP critical

  2. 2 · Sent

    In the RFP

    RFP-003§4.2

    URS-014

    Each vendor answers this requirement directly: complies, partially complies or does not comply, with evidence.

  3. 3 · Scored

    In the bid evaluation

    Bid comparisonURS-014
    Vendor APartial Vendor BComplies Vendor CComplies
  4. 4 · Tested

    In qualification

    OQ-BR201Step 7

    Hold set point for 60 minutes. Acceptance: 37.0 °C ± 0.5 °C at every reading.

    Traces to URS-014

No retypingThe RFP imports each requirement from the URS. Vendors answer against that list, and protocol steps trace back to the requirement.

No surprises at FATA vendor's partial answer is visible when you choose them, not when the equipment arrives.

No rebuild before the auditThe trace matrix is the record itself, so it is current on the day the inspector asks.

Lifecycle coverage

Most validation tools start at the URS. GMP Suite starts at project intake.

The decisions that shape qualification are made before the URS exists: what the project is for, what it will cost and when it must be ready. GMP Suite holds those too.

  1. 01Intake and funding: covered by GMP Suite only
  2. 02URS: covered by GMP Suite and typical validation tools
  3. 03RFP and vendor bids: covered by GMP Suite and typical validation tools
  4. 04Design and DQ: covered by GMP Suite and typical validation tools
  5. 05FAT/SAT: covered by GMP Suite and typical validation tools
  6. 06IQ/OQ/PQ: covered by GMP Suite and typical validation tools
  7. 07Handover: covered by GMP Suite and typical validation tools
Built to work with what you have

No new habits for your planners, vendors or reviewers.

  • Bring your schedule

    Import the baseline from the planning tool you already use, then track milestones against it.

    ExcelMS Project XMLPrimavera P6
  • Vendors never take a paid seat

    Vendors and other external users work in their own portal, so you never ration access to the people supplying the evidence.

  • AI drafts, people decide

    AI proposes URS requirements, risk assessment entries and protocol steps. None of them enters the record until a named person accepts it.

Trust, for QA and IT

A new GMP supplier should be easy to check.

These controls are in the product today. Ask us and we will take your QA and IT teams through the detail behind each one.

GMP Suite is designed to support compliance. Compliance itself depends on how each customer validates and uses the system.

In place

  • Electronic signaturesDesigned to support 21 CFR Part 11 and EU GMP Annex 11, with re-authentication at every signature.
  • Tamper-evident signature recordElectronic signatures are anchored in a cryptographically signed hash chain for each customer, so a changed signature record can be detected. Key actions are also logged with who, what and when.
  • Customer data isolationEach customer's records and files are held under their own tenant. Queries and file access are limited to that tenant, and an automated build check looks for queries that are not.
  • Single sign-onSign in through your own identity provider using OpenID Connect.
  • Full data exportYour administrators can export a complete copy of your records and files whenever they need it.
Design partner programme

Run your next project on GMP Suite, and shape what it becomes.

Two places remaining

  • A pilot on one live project.
  • In return, you act as a reference.

We reply to every application. Your details are used only to discuss the programme. See the privacy notice.

Cormac Falvey
Who builds it
Built by a validation engineer, for the people who have to sign the protocol.

Cormac FalveyFounder, GMP Suite

More than 10 years on pharmaceutical and biologics capital projects, from URS to qualified handover. GMP Suite is the system that work was missing.