Guides
Practical guides for validation, C&Q and project engineers on GMP equipment projects.
How do you write a URS for GMP equipment?
How to structure a user requirements specification for GMP equipment, write requirements that can be tested, and avoid the common mistakes.
How do you build a URS-to-PQ trace matrix that stays current?
What a requirements trace matrix should link, how to keep it current through a project, and how to handle requirements that are not tested.
How do you evaluate vendor bids against the URS?
How to use a compliance matrix to compare vendor bids requirement by requirement, handle partial answers, and record the decision.
What is the difference between commissioning and qualification?
How commissioning, qualification and verification differ, where each applies, and how to avoid repeating the same test.
What should you test at FAT and SAT, and can it count towards qualification?
What belongs in factory and site acceptance testing, and the conditions under which vendor test results can be used in qualification.
How do you derive IQ, OQ and PQ tests from the risk assessment?
A practical method for turning a system risk assessment into IQ, OQ and PQ tests with clear acceptance criteria and a recorded rationale.